Live Oak County, Wastewater System Improvements for the Colina Lopezville Area

The construction contract involved installing a new sewer system to an unsewered area adjacent to George West, Texas. The project included approximately 6,000 L.F. of 10-inch sewer, 4,800 L.F. of 6-inch sewer, a 200 GPM lift station, 2,000 L.F. of 6-inch force main, and street construction.

Services Provided: Preliminary Engineering, Final Design, Bid, Construction including RPR Services, and Warranty Phase.